Q: What is the process?
A: Simple as 1-2-3
Q: Permitting?
A: You can pull all your own permit, we can help you through the process.
We can pull permits for a fee; depending on location.
Q: How long does it take to get my building?
A: Installation times are forecasted by the factory, in most cases, 6-8 weeks after the permit is pulled and site work passes any needed inspection's.
Q: What is the wind-speed rating of our building?
A: 105-150 mph standard and 105-170 mph Wind-LOA optional, this can be mandatory depending on location and regulations.
Q: How are the buildings mounted?
A: If mounted to concrete wedge bolts are used. If ground mounted anchors or rebar are used.
Q: What gauge metal do we use for our frame?
A: (2x2) 14 gauge is standard and 12 GA is optional
Q: What gauge metal is our roof metal?
A: Due to the high winds in Florida we use 26 Gauge standard, 29 Gauge, is used in other states.
Door Options
*Roll Up Door Options
Window Options
*Roll Up Doors installed on the eave side of a building; the wall height must be a minimum of 2' taller than doors measurement.
What are the options on metal orientation?
Vertical or Horizontal
What size footers small buildings?
12 Wide up to 30 Wide
What size footers for large buildings?
32 Wide up to 60 Wide
Q: Do We Offer Insulation?
A: Yes! Insulation is available. It makes a huge difference in the Florida sun. R15 Rated and is also a heat barrier that reflects the heat. If you don't put it in when the building is installed, chances are you never will...this can be a big regret.